Results: 1 - 6 of 6
Summary Report, Dewatering Scheme for Overburden of Great Canadian Oil Sands, Fort McMurray, Alberta
Sep 30, 1972
Open File Report
… methods of dewatering of the overburden on the G.C.O.S. lease. I … report, dewatering scheme for overburden of Great Canadian Oil … Report, Dewatering Scheme for Overburden of Great Canadian Oil …
Oct 31, 1968
Open File Report
… of dewatering the GCOS overburden, included the mapping of … by equipment removing overburden, may present some … or leaving the lease through the overburden. The net result of water …
Jul 02, 1968
Open File Report
… the purpose of dewatering the overburden. The sump at the present … studying the ground water in the overburden, any conclusions arrived … sump on the ground water in the overburden is provided by thirteen …
Mar 07, 2011
Open File Report
… regional bedrock topography and overburden-thickness maps as part …
Dec 31, 2000
Earth Sciences Report
… that are covered by thick overburden, steam assisted oil …
May 31, 1993
Open File Report
… with respect to possible overburden and reservoir …