Results: 1 - 3 of 3
Summary Report, Dewatering Scheme for Overburden of Great Canadian Oil Sands, Fort McMurray, Alberta
Sep 30, 1972
Open File Report
Jul 02, 1968
Open File Report
… coincides with the A1 and B1 sand deposits (fig. 14, 15 and 16) … with the overlying BII, AII sand which have a reported …
Oct 31, 1968
Open File Report
… enter the lease through the tar sand but the total volume is small. … thin E unit and uneconomical tar sand may have to be dewatered … above C, E and uneconomical tar sand units makes it less than …